The works performed by DDR Indigenous Contractors included:
- Groundwork preparation for concrete pad
- 100m trenching for electrical installations to the main workshop distribution board
- Surveying, set-out, & construction of reinforced concrete base slab
- Positioning and tie-down of sea containers
- Construction of dome shelter structural steel
- Coded welding & NDT testing
- Dome shelter tarp installation and tensioning
- Installation of in-ground electrical & comms cabling back to the main workshop distribution board
- Full electrical fit-out & commissioning for dome shelter workshop
- Installation & commissioning compressor
- Installation & commissioning of 25,000 ltr water tank